
Here are some things that could be painted today and tomorrow if you would like to come help at the church church:
Paint nursery hall and bath (morning sun yellow)
finish green wall in preschool room
remove shelving wall in kid’s room and patch those two walls
Prime the rest of the coffee bar wall (big wall at end of lobby)
Paint the lower and upper walls in the lobby (if Chino wants to spray it I bought three rolls of plastic to tape on the windows.) David M is putting the second coat on the upper walls tonight on the left side of the lobby.
(lower walls and the wall behind the coffee bar are all Knitting Needle gray
upper Soffit on walls will be the darker pewter stone gray)
Men’s bathroom ceiling needs to be finished and a second coat
Men’s stalls are sanded now, need to be painted
walls in the entrance and the office not yet ready to be primed.
We have gallons of primer In the back of the nursery that can be brought down to be used. There are four sinks in the back of the multipurpose room that needs to brought down for Dave to work on installing Friday or Saturday.