• Thank you for all of the help so far! We are getting so close, but could use help to finish each room at the church over the next two weeks. Tomorrow rolled flooring will be delivered. Friday Chino will need help putting it in the kids room. Saturday: could use help with cleaning! Walls, glass, floors Sunday after the service, we need help in the Office: Move everything out, put down the flooring, then move it all back in. If you have time to help: here is a list of other projects to complete!! - we have a LOT of garbage to be cleaned out of the old church rooms, especially in the storage area behind the old worship room. This must be done before Monday (as Dunhams begins demo on Monday) -Hang doors in prayer room with new knobs -Men’s bath needs a deep cleaning and scrub paint from floor -Woman’s bath was cleaned, the floor needs the grout cleaner used -Woman’s bath has 2 stall doors to be repainted on the inside. Please lightly sand them first to make smooth and use small foam roller to apply paint. (Roller heads and paint on the table in office) -Glue down more carpet tiles in preschool room, from entran email door to the nursery door -put up Shelves and a counter for cleaning supplies. -paint a Clear coat on 2 closet floors
    1. PAINTING TODAY: Large entrance walls:knitting needle gray sand the corner in entrance and paint lower walls and the wall behind the coffee bar are all Knitting Needle gray upper Soffit on walls will be the darker pewter stone gray Paint 2nd coat on nursery hall (morning sun yellow) AND paint the two doors and door frames yellow in nursery paint Kid's Check in walls Finish walls in preschool room with gray 2nd coat on men's stalls
      1. Here are some things that could be painted today and tomorrow if you would like to come help at the church church: Paint nursery hall and bath (morning sun yellow) finish green wall in preschool room remove shelving wall in kid’s room and patch those two walls Prime the rest of the coffee bar wall (big wall at end of lobby) Paint the lower and upper walls in the lobby (if Chino wants to spray it I bought three rolls of plastic to tape on the windows.) David M is putting the second coat on the upper walls tonight on the left side of the lobby. (lower walls and the wall behind the coffee bar are all Knitting Needle gray upper Soffit on walls will be the darker pewter stone gray) Men’s bathroom ceiling needs to be finished and a second coat Men’s stalls are sanded now, need to be painted walls in the entrance and the office not yet ready to be primed. We have gallons of primer In the back of the nursery that can be brought down to be used. There are four sinks in the back of the multipurpose room that needs to brought down for Dave to work on installing Friday or Saturday.
        1. Lots of big beautiful walls to paint tomorrow and Sunday if anyone wants to help! Or sinks to be replaced toilets to replace (that sounds extra fun!) bathroom ceiling can be painted trim… ❤️ So thankful to God for this place. I am here painting now and just worshipping, singing out to my Jesus just think of the prayers, songs and laughter these walls will hear
          1. PROJECT LIST FOR THIS WEEKEND 1/21-1/23 I am working tomorrow (Friday) during the day and evening on Painting the Office and Family suite. SATURDAY WORK BEE 10am start time: The Primary Bathrooms (both Men's and Women's) need some Remodel work. I have one person willing to take charge of this project but could use assistance. Please let me know if you can help with these tasks: -One toilet in the women's needs to be replaced -Large Vanities in each bath need to be removed (including large mirror) -Each bath have two vanity sets to install (Base, Sink, Faucet, mirror all in one set) -Each bath will have a new vanity lights to replace We must wait for the professional work to be completed before we can start painting in all of the rooms. Here is what we can paint: -Entrance: two of the three walls can be painted -The upper part of the wall (a ridge up to the ceiling) in the entrance and lobby -Men's and Women's bathroom Stalls need to be painted -Trim on both bathroom doors -Family Suite and Office will need to be finished -Prayer and Counseling Rooms - Removal of 2 toilets in the worship center - Replacing 31 Ceiling tiles (a few in each of the Rooms) Non-skilled work: Bathrooms: -The Red tile walls in the woman's bathroom needs to be cleaned and sanded -Ceiling lights need to be cleaned and light bulbs changed Has anyone covered tile with wood planks before??
            1.  — Edited

              Tomorrow at 11am we will meet to get the party started! There are a couple additional tasks we can try to cover tomorrow: - Bathrooms to be cleaned  -Take down DJ stand in student center -Fill in holes, sand and Paint main wall in Office/student center -lots of screws to remove and holes to fill in the counseling/prayer rooms (power screwdrivers/drills would be helpful to bring with you) If you are able to help tomorrow, please try to bring some of your own tools for your tasks (if you have them- don't go and buy anything) Looking forward to a great start! See my first post also!! Blessings on your night, Jill
              1. There will be a "work bee" this Saturday at 11am. We are waiting on contractors and electricians before we can paint rooms, or put down carpet or baseboards. Here is what we can do this Saturday, please let me know if you can help with these specific tasks: 1. Removal of three toilets: there are two baths in the worship center, 1 in kid's bath 2. Using a power lift to take down a lot of ceiling tiles in the "lobby" and a few in each of the classrooms. (maybe we could use a very tall ladder for the classroom ceilings?) 3. Using the lift to paint the metal seams of that drop ceiling (after old tiles are removed) 4. Removing all plastic outlet covers in each room (keep track so we can replace them with white) 5. Changing out some actual outlets from red or tan to white 6. Removing old vinyl baseboard 7. We have some walls that need to "prepped" for painting with putty and sanding. 8. Several light bulbs to be changed in 1st-5th grade classroom 9. Prayer Suite: Paint window and door frames white. Replace some ceiling tiles 10. Hallway: remove signs from doors -Has anyone used a floor grinder on concrete? or sealed a concrete floor? -Could anyone take over the Children's bathroom remodel? This can be done any time between 1/15 and 1/30 Paint walls replace a toilet install of vinyl flooring (over cement) replace pedestal sink and faucet (possibly mirror)
                1. I can help with #4, the outlets and #9 painting in the prayer suite. Paula
                2. I cannot help Saturday but I will be able to help several afternoons this week after 330